check the residual DC voltage with a volt-
meter. Then you may work on the termi-
nals. See chapter 2.1.
· Always disconnect the PV generator side
first by opening the PV generator switch;
then interrupt the grid connection by iso-
lating (switching off) the corresponding
grid fuse!
· Never disconnect the PV generator by
pulling out the Tyco Solarlok connectors
under load. Otherwise a powerful electric
arc might damage the connectors. The
damaged connectors then have to be
replaced!
· If your PV system does not have a PV
generator switch, interrupt the grid con-
nection by isolating (switching off) the
corresponding grid fuse first. A fault will
then be recorded in the fault memory
of the Solar Inverter, however.